Re: Power Supply Work
Each rack had its own UPS.
The entire server room had an autostart generator and transfer switch.
Generator was tested monthly, but was only ever needed about 5 times.
UPS batteries were hot-swapped, and on the rare occasion we replaced a UPS, we used suicide leads to bypass it during the process.