BG installed a type 2 smart meter in Nov 2018, including network kit. SSE came in Dec 2018 to install a type 2 meter but did not have instructions/permission to use BG network kit. SSe came again in July 2019 but could only install a type 1 smart meter (no interface to monitor). We await the installation of a type 2 smart meter from SSE. It seems that dual suppliers are the problem. maybe the objective is to make consumers get all their supplies from one supplier. What a cock-up and SSE down cost wise two failed visits.