Re: Bit risky...
Yep, at a London Datacentre of some repute.
A reel of armoured cable was taken to the 4th Floor in a goods lift rated at 4 Tons, and rolled out onto a floor good for about 1. Underneath which was a fair amount of data cabling.
Hilarity ensued.