* Posts by ParaSitius

2 posts • joined 1 Aug 2011

BT superfast home fibre plans fall behind schedule. Again

ParaSitius
FAIL

Except BT keep putting the date back each quarter, my local exchange is now a year overdue and I'll be lucky if it's done by the end of this year.

What really annoys the hell out of me is that the exchange has had FTTP installed for over two years now as it supplies the flats that have been built around Wembley Stadium, but they can't be bothered to do FTTC for the rest of us in the area.

Spotify smacked with patent suits in US and Netherlands

ParaSitius

Good grief

Think of the poor lawyers, whatever would they do without these patent battles?

SUBSCRIBE TO OUR WEEKLY TECH NEWSLETTER

Biting the hand that feeds IT © 1998–2021