lander.exe
It's almost like Musk is just playing Lunar Lander
3875 publicly visible posts • joined 19 Jun 2009
I understand his laptop computer was set up with encryption but his arrest was orchestrated to ensure that his session remained open, so they had everything in the clear.
He did think he was too smart to get caught, which I agree was very dumb. And then he continued pretending he was smarter than everyone else throughout the trial and sentencing hearing...
Ethically clean? Even if he didn't try to have those people killed, there's still the matter of trafficking drugs and laundering money.
The defence never did explain why everything going on in Ulbricht's life for the duration of Silk Road was also recorded in DPR's journal. A retrial would definitely keep the comedy rolling on though.
Edit: I eventually thought I'd address this strange display of ignorance seriously.
We control populations of introduced species because of the damage they to do ecosystems that developed without them. In Australia, which is an island and thus developed in isolation, there are a lot of those.
For example, the rabbit was immensely destructive in Australia because it had few predators to keep it under control. Also have a look at the destruction wrought by cane toads*, crown of thorns starfish and latterly fire ants, to name only a few.
* A perfect but unfortunate example of a control program gone wrong. We aren't quite so careless these days.
Successful - not sure but Australia has a history of using virus to control rabbit population. Still around and who knows what got other species got affected
When Rabbit Haemorrhagic Disease ("Calicivirus") was introduced here 25 years ago the effects were fantastic. It's like Ebola for bunnies.
Pet rabbits (obviously) and cats should be vaccinated against it but otherwise it wasn't a disaster.
In SpaceX's favour, their engines are far simpler than the Space Shuttle's RS-25s, and are designed to be fired many more times and for far longer than necessary for a single launch. The Falcon 9 first stage also doesn't return from orbit and thus doesn't require the Shuttle's fragile and expensive heat shielding. Etc. etc.
They're two entirely different vehicles, and SpaceX has undoubtedly benefited from the lessons learned by their predecessors.
Whoops! "A third is incompletely combusted" is incorrect, since what I mean is "there's enough oxygen to completely combust two thirds of the fuel" and they're not the same.
Anyway at an O:F of 2.3:1, the stoichiometry of C:H:O is 1:2:2, so (again, assuming no mistake in the calculations) under ideal circumstances you can go completely to H2O + CO, or completely to CO2 + H2. Or, as we see, several species (probably even some O2) including free carbon to complicate matters.
They also run rich because leaving significant diatomic hydrogen and carbon monoxide in the exhaust stream is more beneficial for efficiency than burning all the way to water and carbon dioxide. Running rich also allows you to control the combustion chamber temperature, which in the case of reusable engines is also beneficial.
According to this information, LOX/RP-1 engines run an oxidiser:fuel ratio of ~2.3:1 by mass. Based on the average molecular formula given, ~3.4 kg of O2 will completely burn 1 kg of RP-1 to H2O and CO2, so assuming I haven't made a mess of the calculations, almost a third of the fuel is incompletely combusted, leading to lots of H2, CO and a bit of free carbon in the exhaust.
All of the barge landing attempts were failures, although there was a successful simulation without a barge in place prior to the barge landing attempts.
That said, this one is perhaps the most impressive of all landing attempts since the booster returned to the launch site rather than follow a (largely) ballistic trajectory to a downrange landing site.
Correct so I did a little google research. Cases where the time is more than say 30 minutes look to be rare and the most the delay between blocks has ever been (back to 2011) is around 1.5 to 2 hours.
The time between blocks is another important consideration.
However, I was referring to the fact that when you send a transaction to the network, there's no guarantee that it will be included in a block. Miners aren't forced to verify transactions and occasionally mine empty blocks because it saves on processing time. You can add a transaction fee to improve the probability, but it's still no guarantee. When you do so you're also trying to guess what fee you will need to exceed the fees attached both to transactions that are already sent and waiting, and those that haven't been sent yet. Fees below a certain amount are at risk of being marked as spam and if you haven't included a large enough fee, many miners will simply ignore you anyway.
In the last few months there have been attacks that pushed the number of transactions in the network's "mempool" out to a day or more worth of backlog, which even with a big enough fee to avoid the transactions being marked as "spam", cost a trivial amount of money to stage (several thousand US dollars). It isn't a very robust system.
Transfers with Bitcoin take on average 10 minutes to any address on the network and the network is useable anywhere world wide with internet access (so global transfers in 10 minutes).
The average hovers around 10 minutes, however any transaction could be confirmed in the next block, or it could languish for days, based on any number of factors.
It's also good practice to wait for multiple confirmations to ensure that the block containing that first confirmation isn't orphaned.
@a_yank_lurker: Oh certainly. It wasn't meant to be a jab at "da gummint", merely an observation that I can fully understand how these things happen based on my experience working for government clients. Obviously the contractor isn't without fault either. As a private consultant (albeit not in software development) the problem can be exacerbated by assuming the client knows what they're talking about and rolling with it, because you can't do their job for them as well, and there often isn't time to second-guess the client either.
I work in a small city though, where the problem is more common on account of the size and responsibilities of the government departments. You'd expect QLD Health to be large enough to have some people around with the required technical background. Then again, health departments sometimes have enough trouble commissioning new hospitals and that's supposed to be their core function.
Government's bad and overly-flexible brief plus lousy project management
I've found this to be quite common whenever governments have outsourced 100% of their technical capabilities. They end up with nobody in-house who understands how to communicate requirements from within the organisation to the contractor/consultant, and vice-versa.
On a possibly related note, I've encountered lots of government project/contract managers ("the client") who think that it's perfectly acceptable to change the scope/requirements at any time up to and including the delivery date, without a contract variation. These people are the worst to deal with. And when you try to invoice them for the time you've wasted dealing with their shit...
Granting of planning permission always ends up with "bribes", eg a supermarket wants permission to build so they promise to build a school too, or improve the road junction into the store
Conditioning a developer to contribute to upgrades/maintenance of the local transport infrastructure so that it can cope with the increased demand generated by the development is perfectly sensible and civilised.
And you'd think the "user pays" crowd would be all for it too.
The last few generations of Intel's full-fat x86 CPU haven't resulted in much of a performance improvement anyway, so there's almost no need to upgrade your CPU(/MB/RAM) unless what you've got pre-dates Sandy Bridge or you absolutely must have the latest and greatest. Also, if you're overclocking the headroom has decreased.
Just buy a shiny new video card and be happy!