Re: Aircon and networks
"All this could have been avoided if there had been a manual override on the generator, to start it and leave it running"
Or if someone was smart enough to shut off the main breaker feeding the utility side of the transfer switch. That would emulate a power failure. Leave off until the server room was cool and the UPSes were topped off, or until the storm passes.