Reply to post: Re: Architect Smartitect

Phased out: IT architect plugs hole in clean-freak admin's wiring design

Martin-73 Silver badge

Re: Architect Smartitect

Nothing like phases being wrong etc, or ethernet wiring... but one well known contractor who Love(ll) to build social housing, at least on a development i was presented with, had handily wired all the telephone wiring on one side of the building (one socket in each room) back to a main socket in the hallway... which then had a single cat 5 (not proper CW1308 but apparently that's normal now) back to the eternal NTE, and the other half back to the kitchen socket, and a second cat5 back to the NTE. (which has ONE set of wiring terminals)

Result... 8 cables jammed in one normal phone jack (Krone IDC terminals rated for 'up to 2 connections' provided the wiring is smaller gauge) and 2 cables at the NTE with terminals rated for ONE wire only.

The openreach chappe told me they'd done similar at blocks of apartments but because it was easier, he had 7 cables to contend with at each NTE.

Some 8B connectors and a huge chocblock behind the hallway socket got the ONE working... but yeesh

POST COMMENT House rules