The way I heard it the InfoSight team were pleasantly surprised with range of metrics 3PAR produced without changing any code so the task was much easier than initially anticipated. Various key InfoSight people have now left HPE but the plan all along was to shift a lot of the work to India so that should go at least as well as it did for the EVA.