Reply to post: Re: Can't they upgrade it?

Full shift to electric vans would melt Royal Mail's London hub, MPs told

Doctor Syntax Silver badge

Re: Can't they upgrade it?

"but it's doable."

As I read it it was the capacity of the sub-station itself that was the limiting factor. If so "doable" includes being able to build a higher capacity substation on the ground that's available to the substation including getting planning permission for what might be a bigger structure and upgrading the grid connection to the sub-station.