Reply to post: Re: Dear Mrs May

Information on smart meters? Yep. They're great. That works, right? – UK.gov

Julz

Re: Dear Mrs May

From the design spec for all 2 phase smart meters:

"For Operational purposes the meter shall be:

Capable of sustaining a continuous current of 120A for long periods;

Fitted with an internal main Load Switch suitable for prepayment and load limiting purposes

rated to make on fault current and safely break load currents of up to 120A."

POST COMMENT House rules

Not a member of The Register? Create a new account here.

  • Enter your comment

  • Add an icon

Anonymous cowards cannot choose their icon