Labor's NBN: headlines with zero substance
> How does the built-network ever get upgraded? It can only be overbuilt, not reused.
Labor Spin: 1Gbps FTTP network
Labor Prediction: In 2026 1% of FTTP connections would be 1Gbps, while 50% connect at 12Mbps
Today: 1Gbps has been available wholesale since Dec 2014, but not one RSP will offer it as a retail plan. 79% on fibre connected at 25Mbp or slower and 16% connected at 100Mbps (down 3% in 12 months)