back to article Google Cloud says a 'power event' caused today's outage

UPDATED Google Cloud has blamed a “power event” for taking down multiple online products for customers in Western Europe, and is pledging to restore normal service within the hour. The unplanned downtime for customers began at 0608 UTC when europe-west-2-b, one of three local availability zones in the London region, started …

  1. Pascal Monett Silver badge
    Windows

    I wonder when beancounters will finally tally the costs of these outages

    Once upon a time, if a company had an IT problem, it only affected the customers of that company.

    Now, thanks to The CloudTM, when there's a problem there are hundreds of companies affected and (tens of) thousands of customers without service.

    And they call that progress.

    1. JimmyPage Silver badge
      Holmes

      Re: I wonder when beancounters will finally tally the costs of these outages

      When they have to pay for them,

      1. Anonymous Coward
        Anonymous Coward

        Re: I wonder when beancounters will finally tally the costs of these outages

        It won't be Google who pays even a bent penny for the outage. Their army of lawyers will make sure of that even though the lawyers will cost more than they'd pay out... Not paying bills is IMHO, the new way of doing things in the USA thanks to Trumpo.

        1. UnknownUnknown

          Re: I wonder when beancounters will finally tally the costs of these outages

          - Force Majeure

          - 99.99% uptime.

          Read your fucking contract.

          Curious what the - now involved since September - FCA will make of this …. it feels ‘reportable’ to me.

    2. Yet Another Anonymous coward Silver badge

      Re: I wonder when beancounters will finally tally the costs of these outages

      On the other hand cloud failures are a lot rarer than in-house IT fsck ups

      It's like saying that motorbikes are safer than trains because a bike crash only affects one person.

      1. Rjan

        Re: I wonder when beancounters will finally tally the costs of these outages

        Bikes are much safer for everybody, when trains full of people are being driven as recklessly as bikes usually are.

        But even if we accept the premise that these cloud services are as safe as trains compared to bikes in terms of the frequency of crashes and overall lives lost, there's still a general argument that it's sometimes much worse to have a widespread disaster concentrated at one moment, than it is to have a series of purely local upsets, because local upsets are usually easier to cope with.

        For example, even if every member of a family eventually dies in turn in a bike crash, there will probably always be extant members alive and able to keep family life going, whereas a train crash can potentially wipe them all out at once.

      2. Doctor Syntax Silver badge

        Re: I wonder when beancounters will finally tally the costs of these outages

        In 20 years I can only remember one power outage and that was when a thunderstorm took out the building's UPS. It took weeks to get it repaired so we just put the servers on the building's uniterrupted interruptible power supply.

        There was a close all with the server room cooling but that was solved with opened doors and a number of fans.

        And where, in this, was Google's UPS? Interrupted?

        1. Anonymous Coward
          Anonymous Coward

          Re: And where, in this, was Google's UPS?

          non existent. IT is an extra cost that will eat into profit margins. That's Beancounters rule no 1. No extra capital costs that can diminish profits and sod the service contracts. They are never worth the paper they are written on.

          1. Flywheel

            Re: And where, in this, was Google's UPS?

            They probably couldn't afford the diesel to run it. Times are hard Y'know, even for a multi-billion dollar company. Or maybe Lord Khan has slapped a ULEZ tax on diesel generators.

            1. Anonymous Coward
              Anonymous Coward

              Re: And where, in this, was Google's UPS?

              Or maybe it’s another sub-station overdue maintenance debacle like the shitshow that took Heathrow out Easter 2025.

              Perhaps wait for the report instead of going full MAGA on us.

    3. Groo The Wanderer - A Canuck Silver badge

      Re: I wonder when beancounters will finally tally the costs of these outages

      Well, one thing is certain: a data center outage from any of the major cluster providers has an eye-watering cost associated with it, and the only thing that saves them from being sued into oblivion for it is weasel-word T&Cs written to demand trials in a Texas or equivalently-corrupt "justice" system that they can buy.

  2. Anonymous Coward
    Anonymous Coward

    Reg Archive link?

    Also seems to have come a cropper - it's now just showing page links to old articles :(

    1. Jason Bloomberg Silver badge
      Angel

      Re: Reg Archive link?

      Use : https://www.theregister.com/archive?start=0

      That fixed it for me. YMMV. Feel free to share.

      I am wondering if this change came about because an increasing number of people are using that instead of the official home page?

      1. Dwarf Silver badge

        Re: Reg Archive link?

        I just don't bother with El Reg much any more, used to be on it several times a day, but now it no longer honours image lite mode - now its harder to take a 5 minute catchup and I find the front page so frustratingly slow to view and get any real info. Even complaints to the editors go unanswered, so they don't seem to care.

        Only came today when the BBC already had the article.

        1. Steve Button

          Re: Reg Archive link?

          yeah, same. Although I tend to skim the headlines using Feedly I rarely dip into the actual articles, and it's been a long time since anyone was "Biting the hand that feeds IT"

      2. Anonymous Coward
        Anonymous Coward

        Re: Reg Archive link?

        Thanks for that, but it seems to be fixed now.

  3. Anonymous Coward
    Anonymous Coward

    "True resilience requires designing for regional failures through multi-region deployments, workload portability, and tested disaster recovery procedures."

    So...just like what you'd need for an on-prem deployment.

    Cloud can fail for exactly the same reasons that any other deployment type can fail. So its not really a good reason to not use cloud.

    1. Yet Another Anonymous coward Silver badge

      That sounds like a lot of work and is probably expensive

      1. Doctor Syntax Silver badge

        Almost as expensive as frequent downtime in the supply line.

        1. Yet Another Anonymous coward Silver badge

          But that's not the project budget that pays my bonus

  4. yoganmahew

    Regional redundancy where are you

    A single AZ outage shouldn't cause that much damage. It seems that Google still hasn't learned from past outages despite claims to the contrary.

    As to the whole 'cloud bad' thing, meh. Few large companies run their own datacentres or physical networks. Equinix, Telehouse, or any of the other colocated providers would cause a similar effect with a DC outage that isn't redundant.

    1. mgb2

      Re: Regional redundancy where are you

      What lesson is there for Google to learn? This is on the customer to design their systems for resilience. There is always a risk of outage if your application is running on a single zone or region, and you mitigate those by designing for multi-zone or multi-region deployments.

      It's either the customers who have not learned, or have decided that the downtime is acceptable relative to the cost of building a resilient system.

      1. Doctor Syntax Silver badge

        Re: Regional redundancy where are you

        But the whole Cloud thing was sold to manglements as being the wonderful solution that never goes down because - well - it's the Cloud. Th fact that the small print said you'd have to spend a lot more money than was on the quote didn't register. And now here we are.

        The vendors have to accept some blame for overselling. The IT professionals who could have warned were never consulted and are now long gone. And manglement probably still doesn't understand that they failed to take the advice of those who were once in a position to have given it had they been asked.

        1. ppmm

          Re: Regional redundancy where are you

          They (the cloud providers) are pretty forceful about designing your deployment to be spread across availability zones, and able to survive the loss of one or more of them. How many of todays' 'victims' are going to admit that either they didn't even try, or they tried but they weren't good enough?

          1. Doctor Syntax Silver badge

            Re: Regional redundancy where are you

            The small print might be on the documents read by the customers' IT staff. But were the cloud providers' salesmen also forceful about that? Was the point made sufficiently forcefully to the decision makers who decided to buy into it because of the budgets that could, they thought, be cut? Some of those cuttable budget items might well have been the salaries of the IT staff who could have designed the deployment.

      2. yoganmahew

        Re: Regional redundancy where are you

        "What lesson is there for Google to learn?"

        GKE is a managed service, it is multi-AZ within a region by design. It shouldn't encounter difficulties because one AZ is unavailable. After the last time this happened (USC-1, IIRC), it was supposed to be fixed that the control plane in GKE would survive an AZ outage.

    2. elsergiovolador Silver badge

      Re: Regional redundancy where are you

      If the US tech bros have virtual monopoly, why would they care about these things?

      It's not like the customers will migrate somewhere else.

      1. Anonymous Coward
        Anonymous Coward

        Re: Regional redundancy where are you

        Yes, it's the Microsoft model. Google learned a lot from Microsoft..

  5. Anonymous Coward
    Anonymous Coward

    Resilience

    I have recently been in a large comms centre (it's military hence no details) where if the main power goes down there is a set of 1 hour UPS systems and 2x large separate standby generators which typically take less than 2 minutes to get on line from a cold start. Several of my other non-military customers have similar setups. All are tested on a regular (weekly or monthly) basis.

    Is this too much to expect from Google?

    Worse than that how is the fault allowed to propagate?

    Given the number and size of sites that have gone down, serious questions should be asked.

    In addition, how long does it take to recover from the outage?

    1. Mishak Silver badge

      Don't forget

      To keep an eye on the fuel levels.

      One place I was at had a similar system that was tested regularly where this wasn't done, with the inevitable "failure" during one of the tests.

      1. Doctor Syntax Silver badge

        Re: Don't forget

        At least the failure was during a test. You do tests to make sure everything can work, find he problems under controlled conditions and rectify them. You may think the fuel failure happened because you did tests. One effect of running the fuel down and replacing it was that you had fresh fuel. I've been on the receiving end of the fact that summer diesel can fail to work in winter due to wax coming out of solution. It was the standby generator for the railway signalling for my journey home. I don't suppose they'd tested for that.

      2. BartyFartsLast Silver badge

        Re: Don't forget

        Hard agree, always check the fuel levels, I've seen more than one standby generator that had half or nearly empty fuel tanks because nobody factored in fuel use of regular testing and maintenance

      3. CrazyOldCatMan Silver badge

        Re: Don't forget

        To keep an eye on the fuel levels.

        One place I worked had a separate 'energy centre' (AKA generator house) next to the data centre with a large fuel store under the nearby car park.

        All was well until, one day, the regular generator test failed because the generator ran out of fuel..

        Turns out that the fuel tank had a leak. And the usual procedure was to estimate the fuel usage and top the tank off *without* checking the level.

        Repairing that was (apparently) fun - I had a friend who was one of the engineers keeping stuff going. The car park was closed for ages while they dug it up, carted away a *lot* of contaminated subsoil and replaced the tank.

        Thereafter, the procedures were amended to check the tank levels (and the new tank had an automated level alert).

        Said data centre is now owned and run by a large cellular provider. As is our admin office just across a (different) car park.

      4. old-iron

        Re: Don't forget

        Had a client that ignored the diesel tank cos it was full, that’s ok then

        Over time the fuel separates, guess what didn't happen when they wanted to crank the gen’s

    2. steelpillow Silver badge

      Re: Resilience

      Enough batteries to sustain the output of a good-sized substation for two hours? Yes, it is probably unreasonable to expect that of even a modest bit barn. Just write it into the SLA and fill the space with more GPUs.

      If you really can't deal with a two-hour service outage, then WTF are you doing with off-prem cloud you dumbass? Resilience is like security and legals, you can't outsource the responsibility.

      1. Anonymous Coward
        Anonymous Coward

        Re: Resilience

        Enough batteries to sustain the output of a good-sized substation for two hours?

        I have seen half hour mentioned in ITTs before, I think it comes down to ye olde days when sites were 24 hour manned and generator started (and in some cases paralleled once running) manually. These days with automatic generator start then you typically only need a couple of minutes (depending on the size of generator and, perhaps, the need to get turbochargers fully lubricated and spun up before going on-load, etc)

        1. steelpillow Silver badge

          Re: Resilience

          Well, that's the thing. Automatic generator start does not really scale to the substation-demands of a modern bit barn.

    3. Jellied Eel Silver badge

      Re: Resilience

      I have recently been in a large comms centre (it's military hence no details) where if the main power goes down there is a set of 1 hour UPS systems and 2x large separate standby generators which typically take less than 2 minutes to get on line from a cold start. Several of my other non-military customers have similar setups. All are tested on a regular (weekly or monthly) basis.

      Is this too much to expect from Google?

      Well, the only things to expect from Google are invoices and excuses. Oh, and probably changes to terns so they can train their AI on your data. But I think datacentres are also getting too big & must fail. So DC's being measured by MW rather than number of racks. Then the amount of UPS needed to power say, a 500MW for 1hr (500MWh!), or just for long enough to fire up the diesels, or gas turbines.. Then some supply chain issues with turbines and large transformers having a lead time of years. And then having a reliable supply of fuel to keep the generators running.

      But the military has experience of doing things properly, despite budget cuts. So owns lots of land, including mines where boxes were once quarried that can become datacentres for all the IT a modern military needs. The real FUN! is likely to happen when UK energy policy results in a black start for the grid, and outages extend to days.

      1. Anonymous Coward
        Anonymous Coward

        Re: Resilience

        Putting aside the strange assertion that UK energy policy will result in a black start, if Spain started restoring power around 3pm on the day and restored full power by 11am the next day I don't see why the UK couldn't.

        1. Claptrap314 Silver badge

          Re: Resilience

          In, I believe, 1997, US East went down. Black start required. We were back to normal function in about four hours.

          Well, I guess, Spain...

        2. Jellied Eel Silver badge

          Re: Resilience

          Putting aside the strange assertion that UK energy policy will result in a black start, if Spain started restoring power around 3pm on the day and restored full power by 11am the next day I don't see why the UK couldn't.

          Because the Spanish outage was to the Iberian peninsula, not the whole Spanish grid, and 'renewables' caused the blackout. Then 'renewables' like wind & solar are intermittent and unreliable, and grids (and datacentres) like reliable power. But demand imbalance, frequency drops, things trip out and grids may become islands that need to be re-energised and resynchronised. Wind and solar can't help with that, so for UK, NESO issues a margin notice because there's no wind, and people want electricity. Like they did on 29th September.

          So the notices give stand-by generators time to get their turbines to speed and make up for the lack of wind, or sunshine. But then 'Net Zero' decided that gas is bad, gas turbines should be banned and we 'invest' in more wind & solar instead, so the risk of a grid collapse and big black start increases because the energy mix favours unreliables. Then because there's an increased need for stand-by capacity, our electricity costs increase even faster. Wiki kinda explains-

          https://en.wikipedia.org/wiki/Black_start#Limitations_on_black_start_sources

          So 'proper' DC's can deal with mini or localised black start conditions by having batteries and generators that can kick in to restore or maintain power, DC's powered by 'renewables' are rather screwed. But those 'renewable' DCs are mostly greenwash, and still rely on an increasingly fragile grid.

          1. Anonymous Coward
            Anonymous Coward

            Re: Resilience

            Because the Spanish outage was to the Iberian peninsula, not the whole Spanish grid, and 'renewables' caused the blackout.

            Do you mean they restarted the country from the Balearic and Canary Islands? No they didn't, they restarted it from supplies from Morocco and France and a hydroelectric power plant (renewable). Here's the final report by entso-e which goes into all the detail anyone could need about why you're wrong.

            The UK also has supplies from the French, Belgian, Dutch, and Irish interconnectors and renewable energy so your touching concern about a black start in the UK is misplaced.

            Hopefully Ukraine can finish the remaining oil refineries off then even Russia, as socially backwards as it is as demonstrated by your posts, will have to pivot to renewables to power the washing machines they've stolen from Ukraine.

            1. Jellied Eel Silver badge

              Re: Resilience

              The UK also has supplies from the French, Belgian, Dutch, and Irish interconnectors and renewable energy so your touching concern about a black start in the UK is misplaced.

              Nope, your faith in tilting at windmills is sadly misplaced. There is a reason why the whole world shifted from the Age of Sail to the Age of Steam as fast as it could to get predictable, reliable power rather than relying on the vagueries of the weather. Especially when Global Warming predicts both more severe winds, and lower winds, neither good for powering datacentres. Then there's the interconnectedness of things, both weather and energy supplies & security. So the Germans came up with a fun word to describe the problem-

              https://en.wikipedia.org/wiki/Dunkelflaute#Renewable_energy_effects

              These periods are a big issue in energy infrastructure if a significant amount of electricity is generated by variable renewable energy (VRE) sources, mainly solar and wind power. Dunkelflauten can occur simultaneously over a very large region, but are less correlated between geographically distant regions, so multi-national power grid schemes can be helpful.

              So then you're rather relying on those common high pressure systems not covering significant chunks of UK & Europe, which then means demand for electricity from the countries that have drunk the Green koo-aid have an energy surplus they can export. Which of course is good news for the people in the energy casino, because demand means massive price increases as everyone's desperate to keep their lights on. Also a bit of bad news for Ireland given they've built lots of windmills and datacentres, and are at the end of the line.

              But such is politics, and a slowly growing realisation that 'renewables' are the problem, not the solution and countries are looking at going back to nuclear.

              Hopefully Ukraine can finish the remaining oil refineries off then even Russia, as socially backwards as it is as demonstrated by your posts, will have to pivot to renewables to power the washing machines they've stolen from Ukraine.

              Oh look! A nafobot! But a bit of a race to the bottom at the moment, with Russia finishing off Ukraine's energy system and leaving it dependent on imports from Poland & Romania. Except Russia has also been hitting those interconnectors. Ukraine yeets drones into 3-4% of Russia's diesel production capacity, Russia responds by plunging Kiev into darkness. Which also allows observers to see the effects of power outages. Kiev has a lot of high rise apartments, but no power means no heating, no elevators, no water because that needs to be pumped. Then the effects on food supplies when there's no power for refrigerators. Then other social effects. Ukraine went big into e-government, but access to those services is lost when there's no power, or datacentres & networks are destroyed. So it allows planners to observe the consequences of power outages, even if these ones are deliberate.

              But the 'socially backward' Russia didn't drink the kool aid, so invested in nuclear rather than 'renewables', including having a bunch of SMRs in operation and a pretty full order book from other nations who want cheap, reliable energy.

            2. Claptrap314 Silver badge

              Re: Resilience

              Hydroelectric is "renewable"? Really? Maybe for a century. But not for two. It's actually a substantial problem to clean up.

              1. collinsl Silver badge

                Re: Resilience

                It can be if it uses pumped storage - use wind/solar power to operate pumps to move water up a hill from one lake to another, then use gravity to generate power at peak demand periods for short bursts of massive load.

    4. Terje

      Re: Resilience

      While I would not expect an hour of ups capacity, there should be more than enough to comfortably get the generators running multiple times over, and there should be a redundancy so that you can lose a reasonable percentage of your individual upses and still have enough power available.

      A power issue should never be a reason for a DC to go down, if you get an internal short somewhere a number of racks may go down, but you should never lose an entire DC to power.

      This just shows once again that you can't trust the cloud scammers to do things even half decently, and when they f-up for any reason, the fallout is way to large due to half the internet having the same single points of failure.

      1. cyberdemon Silver badge
        Devil

        Re: Resilience

        I wonder if someone pressed the wrong Big Red Button and we can expect a Who, Me? In a couple of years after they are settled in to a new job..

        Or possibly someone had forgotten to re-open the gas isolator valve on some generator after routine maintenance, so it failed to start when it was needed

        1. NetMage Bronze badge

          Re: Resilience

          Have a computer room with a single large UPS and power distribution cabinet. PM guy decided to check power distribution with IR camera, but doesn’t realize the inside cover is hinged - unscrews the cover and drops it one the main breaker at the top of the panel. Whole room shuts down. Banned from our campus.

    5. Peter Gathercole Silver badge

      Re: Resilience

      I used to work at a supercomputer site that had a similar setup. Dual mains site feeds, big battery UPS and then generators.

      I witnessed, actually from the control centre, a multi-factor failure. One mains feed was down for maintenance by the utility company, when we had a failure on the second feed (it actually was related to the first feed being down, someone at the utility company took a wrong decision, and did something that shut down the second feed.)

      The first thing that happened was that the systems switched over to the batteries. The second was that the cooling systems switched off. Shortly thereafter, the diesel generators kicked in correctly, but there was another problem, with the power source transfer switch complex (capable of switching megawatts of power). Every time it tried to switch to the generators, it tripped, putting the systems back on to the batteries. Everything had been regularly tested except actually switching to the locally generated power from the generators.

      While on the batteries, the cooling systems were not powered (this appears to be quite standard, I had witnessed this at another site 20 years earlier.)

      The problem with this was that without the cooling systems, the water cooling to the supercomputer frames could not work (water was moving, but at less pressure, only powered by the pumps in the frames which were on the UPS). After a few minutes of trying unsuccessfully to switch to the generators, it became apparent that it was necessary to reduce the load on the batteries and also reduce the heat generation, and we engaged in a crash shutdown of one of the pair of main supercomputer clusters, together with two smaller clusters, and as much on the ancillary systems as could be done, such as the archiving solution and the desktop support environments (neither of which were in my domain).

      They nearly got to the point of shutting down the remaining cluster in order to try to keep the data gathering and communication systems up (weather forecasting, needed to keep gathering the data from the remote weather stations and satellites or else it would be lost) when someone took the brave (or possibly foolhardy) decision to manually prevent the power transfer switch from tripping to allow the generators to provide power to the systems, by physically holding a breaker shut.

      It then became a race to try to either work out why the transfer switch was tripping, or to get one of the external feeds working before the person holding the switch became too fatigued to keep the breaker shut!

      External power from one feed was restored first, but we remained in reduced power mode for some time afterwards just in case we had another external interruption.

      The point I'm trying to make is that even in the best planned environments, first of all more than one thing can go wrong, and cascade failures can happen, secondly, things other than keeping the systems powered can force a shutdown (like a lack of cooling), and third, even if you do have local generation, chances are that it probably can't keep all of the systems in a large data centre running indefinitely, and probably requies shedding of load to keep core systems running.

      At this site, the wash-up concluded that it is difficult to cope with multi-factor failures but the environment should have survived, except that there was an unforeseen fault in the design of the power transfer switch which prevented the generators (which did work correct) from providing power when needed. A few weeks following this, they took a planned complete shutdown of the machine rooms to have this fault rectified. During this, I went into one of the halls, and it was the only time that I was there that they were quiet, with nothing running. It was quite eerie.

      They then did a butt-clenching full test of a dual mains site feed failure while the systems were powered to test that the new design actually worked when there was load on it!

      1. Anonymous Coward
        Anonymous Coward

        Re: Resilience

        They then did a butt-clenching full test of a dual mains site feed failure while the systems were powered to test that the new design actually worked when there was load on it!

        This!

        If you don't run through a full power-fail test with the site actually going on-generator then you don't know if will work, as demonstrated by your tale. On our sites we switch on-generator roughly monthly for 20 min or so to check things work and you don't have transfer switch faults or breakers tripping for whatever reason. We try to coordinate butt-clenches with our clients so they are not doing something ultra-critical just in case...

      2. cyberdemon Silver badge
        Pint

        Re: Resilience

        That reminds me of a story from a company I used to work for (my first job out of uni, i didn't stay there long), which had its own small server room complete with Halon system, which served multiple offices in the UK and Europe.. And a couple in the US and South America

        The "BOFH" was a small beardy man who was apparently a druid in his spare time, and the lanky, Lurch-like PFY seemed to spend most of his time playing Eve Online in their corner of a large open plan office, the CEO opposite likely unaware despite almost line-of-sight to the PFY's screen, or didn't care..

        One day, they had installed some absolutely massive new UPS units (in response to a "power event" a few weeks earlier that had taken down all of the company's offices) and decided to test them to see how long they could keep the servers running. The beardy BOFH gleefully threw the power switch to the server room and waited while the PFY was flying his battleship through some warp gates.. They waited about an hour watching the UPS battery status before they got calls from the staff and sattelite offices that the systems had gone down again.. But the oversized UPS was still running..

        Cutting the power had included the air conditioning in the server room and the servers were cooked, all the disks in the RAID arrays were dead. They had to restore everything from backup tapes. I remember the red-faced BOFH and the PFY with their tails between their legs coming to the building up the road (with the electronics lab where I worked), to collect last week's tapes from the fire safe. The disaster recovery worked, but the engineering team had lost a week's worth of work and I never saw the PFY playing Eve Online again..

        1. NetMage Bronze badge

          Re: Resilience

          I guess they had to learn to put in temperature monitoring with alerting the hard way.

        2. Anonymous Coward
          Anonymous Coward

          Re: Resilience

          I remember the red-faced BOFH and the PFY with their tails between their legs coming to the building up the road (with the electronics lab where I worked), to collect last week's tapes from the fire safe.

          Shirley they went up the road to collect their P45s?

    6. Anonymous Coward
      Anonymous Coward

      Re: Resilience

      I worked somewhere where everything critical was on UPS’ and there were massive generators that started up as soon as the UPS started. This will be light on actual details that might identify anything or anyone as this isn’t something I suspect theyy’d want repeated. The UPS and generators were supposed to be tested regularly (weekly from memory) however this was outsourced to an onsite contractor to do as part of their role. The contractor decided to do it weakly instead and when we did our own scheduled (unbeknownst to the contractor) test the generators did not kick in. Their was diesel aplenty but nothing from the generator and it was found to have seized. Our head of IT went ballistic had an unscheduled meeting with the onsite team and told them they were a bunch of layabouts. They tried to defend themselves with their excellent work on everything else but he was having none of it. They were told that they had breached the SLA on a critical system and were therefore fired as per the contract. What was worse was that they hadn’t told anyone that they weren’t testing as we could have done it.

      1. NetMage Bronze badge

        Re: Resilience

        It’s good to get reports showing test results.

  6. DrewPH Silver badge
    Coat

    Google Cloud has blamed a “power event”

    Like World's Strongest Man or something?

    1. Anonymous Coward
      Anonymous Coward

      Re: Google Cloud has blamed a “power event”

      They specifically don’t say ‘power outage’ which is what everybody seems to assume.

      Because if they could blame it on somebody else they would have done so already.

      My bet is somebody pressing the “do not press” button or similar shenanigans in the power distribution network.

      Either that or the cleaner unplugging something to do the hoovering ..

  7. wsm

    Floor polisher fault tolerance needed

    Thought Google would be immune to this stuff: https://www.snopes.com/fact-check/polished-off/

    1. Excused Boots Silver badge
      Trollface

      Re: Floor polisher fault tolerance needed

      Coming soon; an El Reg ‘Who Me’ article.

      “Well I was looking for somewhere to plug my vacuum cleaner in and thought.....

      1. Anonymous Coward
        Anonymous Coward

        Re: Floor polisher fault tolerance needed

        I've had exactly that happen 2 days running at a large US conference center. We set up all the equipment when leaving for the day, came in the next day to prepare the demos, and found everything had restarted.

        It was fixed by taping a large sign (written in Spanish as well to be sure it was understood) over the power strips, warning the cleaners not to unplug things from them when vacuuming the booth carpets.

      2. Peter Gathercole Silver badge

        Re: Floor polisher fault tolerance needed

        Many places I have been actually have designated power sockets for cleaner's machines, and enforce this by putting non-standard plugs on the cleaning equipment and these sockets so that the machines could not be plugged into the 'clean' sockets.

        The varient I saw most recently had a near-standard UK plug, but with the earth pin rotated bt 90o, and also coloured orange or red or some other colour.

        1. Doctor Syntax Silver badge

          Re: Floor polisher fault tolerance needed

          It doesn't stop the cleaner unplugging the critical kit before discovering their plug doesn't fit.

          1. David Hicklin Silver badge

            Re: Floor polisher fault tolerance needed

            > It doesn't stop the cleaner unplugging the critical kit before discovering their plug doesn't fit.

            You will be amazed what will fit with enough brute force.

            On the other hand I have seen people putting wires into the socket holes before plugging the localised plug into the socket to get stuff to run...

  8. elsergiovolador Silver badge

    Power event

    Highest taxes in living memory, highest energy bills in living memory yet piss poor infrastructure.

    You start asking question who is stealing all the money any why those responsible choose too look away?

    1. nbc

      Re: Power event

      You've answered your own question there.

  9. Tron Silver badge

    Lloyds Bank, HSBC, Royal Mail, Rightmove, DPD, BT, Cloudflare, Screwfix and Revolut

    If you are covering the UK like that, use "GMT".

    1. IGotOut Silver badge

      Re: Lloyds Bank, HSBC, Royal Mail, Rightmove, DPD, BT, Cloudflare, Screwfix and Revolut

      It's in UTC, the proper time format

      Also the UK is in BST, sooooo.

  10. Marty McFly Silver badge
    Coat

    So the fix is...

    Some talking head blathered, "True resilience requires designing for regional failures through multi-region deployments, workload portability, and tested disaster recovery procedures."

    Got it. No problem. More Data Centers, please!

  11. spold

    Even Gemini...

    ...needs to learn not to stick its fingers in the wall socket.

  12. John Riddoch
    FAIL

    Wait...

    It wasn't DNS this time? Impossible!

    1. Doctor Syntax Silver badge

      Re: Wait...

      It's always the DNS except when it's the UPS

      (The UPS of the DNS server is a double whammy.)

  13. JimmyPage Silver badge

    A reminder (if it were needed)

    That when you are "100% efficient", you are also 100% exposed to any and every blip on the horizon. You are indeed the weakest link.

  14. Anonymous Coward
    Anonymous Coward

    A lot of readers who seem to be hosting experts, assuming the issue was on the supply side of the internal distribution, their was no UPS and that Google doesn't do any testing.

    1. NetMage Bronze badge

      Some of us are assuming that Google’s own managed services would be built to be redundant across DCs.

    2. Doctor Syntax Silver badge

      A lot of readers are assuming that Google are hosting experts and, therefore, should do better.

  15. Nik_S

    Power outage?

    Speaking as someone who used to advise enterprise clients about building reducndant power into data centers, it's pretty depressing that a power outage takes down what should be a tier-1 datacenter with fully redundant power. I have to assume that Google decided that redundant power was too expensive and that customers would design their apps to failover gracefully in the event of the loss of a datacenter which is really bad assumption.

  16. Boris the Cockroach Silver badge
    Facepalm

    A power outage?

    <in the same tone of phrase used during the parrot sketch>

    Whats the betting that the google site in question today has a total of 3 independent power feeds, 1 of which alone is capable of keeping the site running, but by a strange quirk of fate all three run in the same power trunking across the carpark, and the guy with the JCB was digging up the carpark. oh and the generator fuel tanks were empty (as they always are) because fuel is like... expensive, easily stolen and we've run 47 successful start up tests since the last time anyone looked in the tank.

    1. Mishak Silver badge

      ISP

      One of my friends used to run a small ISP/hosting company.

      They had specified redundant trunk connections to the internet and had proved that everything failed over if either connection went down.

      However, a few months later they suffered a total loss of connectivity that lasted a few days.

      Turned out that the two providers had merged and removed the redundancy as a cost-saving exercise, but failed to consider the implications or advice any of their customers.

      1. Jellied Eel Silver badge

        Re: ISP

        Turned out that the two providers had merged and removed the redundancy as a cost-saving exercise, but failed to consider the implications or advice any of their customers.

        That happens, and has been bit of a bane of my life. Or source of consultancy fees. Supplier diversity sounds like a good idea, but often isn't. Your friend may have specified redundant trunks, but essentially just rented two circuits. Unlikely to have been any SLA for this because two suppliers involved. Then there's FUN! stuff, like supplier B might be a wholesale customer of supplier A, so might be no diversity or seperacy along part of the route. Or supplier A may upgrade or re-groom capacity, and supplier B's circuits also move. Or like you say, M&A might mean a loss of supplier diversity all together.

        And then some pain, ie producing maps. Common snag. Client says we want diversity from supplier B, but won't tell me who supplier B is, or the path they've chosen. So expecting me to play guess the route.. And then unless both suppliers have some form of defined path service and a way to reflect that in provisioning & management systems, circuit might get re-routed anyway. So sometimes it's better to use a single supplier who can provide an assured seperacy service, and an SLA for that. BT does this, but may cost arm + leg, especially if (when) excess construction is involved. But then you can sleep easily, knowing that both paths are at least 2m (width of a typical JCB bucket) apart.

        But such are the joys of the transmission side of networking.. Which is mostly a 'know thy enemy' kinda thing, and how that can help or hinder your sleep pattern. Sometimes doing things at the transmission level can work out much cheaper than with routers. So a favourite example was from a vendor that shall remain nameless who wanted us to buy 4 BFRs plus very expensive STM-16 interfaces, when all we really needed was protected STM-16 and a couple of fibre Y-cables. Cheaper, more reliable and the transmission layer would switch path before the BFR even noticed. But can do similar tricks with DF links or other optically provisioned services, if you're careful and understand the interface between BFRs and the real world.

  17. Anonymous Coward
    Anonymous Coward

    If I'm not mistaken, with one of the aforementioned enterprises, to fail over their GCP workloads to another DC, it has to be initiated manually, system by system. It's not an automatic, hands off by tenant activity, actioned by Google.

    Probably way off from what the slick cloud salesperson managed to sell the c-suits

  18. baynewton

    Is it naïve of me to think that large banks' infra should have been multi-region to cover this kind of issue? Or are they trying to squeeze margins on infra cost and just put all their eggs in one region and cross their fingers?

  19. Claptrap314 Silver badge

    Here we go again...

    I was with G 2015-2016, as an SRE (SWE side). That is, I got to see the early run-up for GCP.

    First, it's important to note just how extremely different GCP is from the internal systems G built up until 2014. When I arrived, our systems were build around DC availability of about 88%. Google service availability at the time was very much 5+ 9's. Troll the archives for Google service outages 2010-2015.

    But building a global HA system on such a substrate requires amazing OPs expertise backed up by some very senior SWEs. The FAANGs had that. Most enterprises don't. Let alone the SMBs. And GCP was not selling to the other FAANGs. The sales team pushed back, and rightly so. DC availability had to go up. Way up. In fact, at the DC level. the entire application of SRE had to be rethought.

    So, they broke DCs up into availability zones. Now, a full DC was never supposed to go down. This meant that all of the complexity of power redundancy (previously handled by the power grid as a whole) now had to be moved into the DC. And aircon. And water supply.

    As for customer-received HA? That still required multiple AZs. I don't know what G "promises" regarding AZ availability, but I would be shocked if a single AZ is supposed to be HA.

    Google & AWS can give you the tools for HA. (Well, as long as us-east-1 stays up) You still have to know how to use them.

  20. Kistelek
    FAIL

    Obligatory XKCD

    https://xkcd.com/908/

  21. Winkypop Silver badge
    Big Brother

    Outage

    We’ve always been at war with europe-west-2-b

  22. Anonymous Coward
    Anonymous Coward

    Multiple failures from a power event? Haven't we seen similar with MS and other clouds before... switching edge routers/ load balancer that kind of thing?

  23. RMNeuroSpine

    It is worth repeating, there is simply not enough end user understanding of the impact hyperscaler organisations have on the daily lives of global citizens. It is easy for hyperscalers to output an excuse without appropriate consequence (and no, financial penalties are not enough), the news moves on and services are back online. Europe is increasingly taking a stand and looking for solutions that mitigate single supplier (and non-EU supplier) incidents. However, whilst the lobby is still so strong, progress will continue at a snails pace. Where does this leave the average global citizen? Continually at the behest of the hyperscalers, who act with impunity and provide no transparency in their self-interest of 'we can't tell you because that is a security risk (and because our lawyers told us not to)'. Incidents such as this need more discussion outside of the technical community to highlight to power being given over to technology companies that will soon have the ability to switch things off whenever they want for whatever reason they want.