So what are spacex supposed to launch on starship apart from more littering of leo with starlink? as far as I know there is no way to deploy any normal satelite that happens not to be IKEA shaped... I see falcon 9 being the workhorse for anything but potentially starlink for the foreseeable future for spacex. I do hope Rocket Lab can get neutron to orbit without to many failures on the way, after all they are not stuck with a hideously stupid design drawn by a five year old like spacex.
Rocket Lab pushes back first Neutron launch to 2027
Rocket Lab has delayed the maiden launch of its Neutron rocket again, due to carbon composite manufacturing issues. It is more than five years since Rocket Lab said it was developing the launcher, a step up from its workhorse Electron, and capable of sending up to 13,000 kg to Low Earth Orbit. At the time, 2024 was mooted as the …
COMMENTS
-
-
Thursday 15th October 2026 13:22 GMT Mishak
You really think SpaceX haven't thought about that yet?
They are using Starlink V3s as test payloads during development rather than a mass simulator so they can get something useful into orbit during development (at their own risk). They have other variants in design for conventional payload deployment, but will be sending loads of flights up to deploy the V3s.
-
Thursday 15th October 2026 13:41 GMT Terje
They probably have thought about that, but I don't trust they have any form of reasonable solution for it or they would have tested it, the solution they have now is minimally structurally compromising, and with the flight profile of starship that put a high amount of forces on the entire body I highly doubt they will be able to add a proper fairing without significant extra weight added to something already disgustingly heavy. Starship + superheavy is just a bad design, to heavy and to many engines to ever reach proper reliability, note that they have yet to have a flight without more or less serious engine issues at some stage and that is with engines that by now have had plenty of testing over many years.
-
Thursday 15th October 2026 14:42 GMT Mishak
No, the V3 Raptor is a new design and has only been flown a few times. SpaceX are willing to use a development rocket as the testbed for their new engine. The flights so far have also proven the ability to reach orbit with multiple engine failures - whilst not ideal, this has helped with the safety case.
And have you seen the V3 Raptor? It's a major engineering advance as all the pipes, wires and bits that are normally on the outside are on the inside, allowing SpaceX to eliminate the weight and complixity of the heat-shields that would otherwise be needed.
-
Friday 16th October 2026 02:53 GMT MachDiamond
"It's a major engineering advance as all the pipes, wires and bits that are normally on the outside are on the inside, allowing SpaceX to eliminate the weight and complixity of the heat-shields that would otherwise be needed."
That means that it's much harder to inspect and recondition. It looks cleaner, but it winds up being more disposable due to that. Very few Raptor engines have been used more than once.
-
Friday 16th October 2026 07:55 GMT Mishak
Musk has acknowledged that repair will be very hard, if not impossible.
However, the aim is to get the per-unit cost to ~$100k. Assuming the reliability is high enough, that would mean the cost to replace would be less than the cost to "over engineer" all units to be repairable. That, coupled with the weight savings over many launches, means the design is probably a good one.
Time will tell, of course.
-
Friday 16th October 2026 13:04 GMT MachDiamond
"However, the aim is to get the per-unit cost to ~$100k."
The rumored price tag right now is closer to $1mn each and Elon is well known for getting cost estimates wrong and never in a good way.
The engine cost is one thing, but the idea they've been touting is "gas and go". The rocket is caught on the tower, they reload payload, refuel and go again in a few hours. Do they swap engines at the pad? It could be done, but it means that all launch activity stops if multiple pads are not miles apart. Just the sound can do serious injury if one is too close.
The redundancy is more nuanced than just being able to say that losing one engine is only a 3% reduction in performance. If it's a gimballed engine, the maths change, a lot. Lose two of those engines and it's lights out. An engine on the outer ring of the booster is far less important for a less than max payload.
Inspection of engines that have failed is going to be very important. If they can't be inspected mm x mm, there may be a fundamental flaw that leads to 5 engines out the next time out. Ideally, there shouldn't be any failures. Burning through 1/3 of the o-ring isn't a 3:1 margin when the o-ring should be burned at all.
-
-
Sunday 18th October 2026 12:30 GMT David Hicklin
""It's a major engineering advance as all the pipes, wires and bits that are normally on the outside are on the inside"
So a failure of one bit is more likely to cause failures of others ?
Like the other poster I do think there are too many engines with complex plumbing, and if they do reach the launch cadence they are planning (which I think is fantasy anyway) the failure rate will be quite significant. After all this *is* Rocket Science we are talking about.
-
-
-
Thursday 15th October 2026 15:21 GMT John Robson
Whilst they have had engines out they have also demonstrated that engine out isn't actually a critical issue, at least on ascent.
One advantage of having 33 engines is that losing one of them is only a 3% loss of thrust.
Why on earth would they be focussed on testing another payload deployment mechanism when they have so many other things to test first. A larger fairing door isn't going to be the biggest challenge on their process, the first generation of it will likely mass more than later generations, but it's barely rocket science.
-
Friday 16th October 2026 02:45 GMT Anonymous Coward
> Why on earth would they be focussed on testing another payload deployment mechanism
Why not test another deployment mechanism as well as the other things?
> Why on earth would they ... when they have so many other things to test first.
First? They have to finish testing all those other things before they can test another deployment mechanism?
They've already shown willing to test more than one thing per flight, why would they NOT take an opportunity to add as many separate tests into a launch as they can?
Especially if it isn't going to be a challenge on their process.
-
Friday 16th October 2026 05:42 GMT Terje
In addition to this I feel that the fairing mechanism would be important to test given that on a "normal" rocket the fairings are dropped on the way up and are not supposed to reenter the atmosphere at orbital velocity. so you probably want to test how your solution to surviving reentry with a large chunk of your structure "cut into pieces" will actually work.
-
Friday 16th October 2026 07:59 GMT Mishak
> Why not test another deployment mechanism as well as the other things?
Because it's not needed yet. They could do it, but they would then have multiple development programs running in parallel - more cost, more factory space, higher risk of a common-mode fault impacting multiple programs.
They will develop it when there is a need (i.e. a paying customer - Starlink are "paying" for the current vehicle and will be "buying" a lot of launches).
-
-
-
-
-
Thursday 15th October 2026 13:29 GMT Irongut
> I see falcon 9 being the workhorse for anything but potentially starlink for the foreseeable future for spacex
Elon does not. SpaceX will retire Falcon 9 and Dragon by 2030, maybe slightly later if NASA decide to run ISS past 2030 and beg nicely.
Starship will launch Starlink, Starshield and whatever they call SpaceX orbital datacenters. That will consume all their capacity for the foreseeable future.
-
Thursday 15th October 2026 13:44 GMT Terje
And Elon is a raving lunatic that have lost contact with reality quite a few years ago now. You don't retire a proven reliable design with something that is not and that don't fit most non starlink launches... and don't get me started on what a massively stupid idea the mega constellations are as a concept.
-
-
-
Friday 16th October 2026 08:20 GMT Mishak
Re: mega constellations
Scott Manley has a video on the feasibility. He agrees it's not going to be easy, but it should be possible.
Probably why it's not just Musk who's looking at it.
-
-
-
Thursday 15th October 2026 17:14 GMT Flocke Kroes
Raving loony? Hell yes.
SpaceX is not a launch company. Their IPO brochure positioned them as an AI company. The bulk of their revenue and debt is wasted on AI. I would accept that they are a company that sells promises that cannot be kept. Their actual main source of revenue is Starlink. They could drop NASA and commercial launches and it would be a rounding error on their revenue. The bulk of defence launches are the same shape as Starlink. Focusing on Starlink and Starshield would give them breakfast lunch, dinner and tea leaving only crumbs for other US launch providers. Amazon LEO will count as elevenses for Blue Origin. The other big constellations will launch on Chinese rockets.
Falcon 9/heavy will still be flying for years. SpaceX are not currently taking new orders for those rockets. The could start taking orders for them and may well do if some other big issue with Starship shows up in the next few launches.
The commodity in short supply is aerospace engineers. Ending Falcon releases some SpaceX engineers to work on projects with a higher rate of return.
-
Thursday 15th October 2026 17:21 GMT Charlie Clark
Haven't they already burned through the IPO cash? I know they've just done a bond issue for more cash for never-never stuff.
They have created a self-serving launch system and can happily live without Falcon rockets. Customers who thought they'd got a cheap and reliable launch service, less so. It became clear years ago that Musk was unreliable and would follow whichever path suited him personally most. He's been a great salesman of the future to many gullible idiots, but people wanting to launch satellites should have done their homework, because by choking off launching other people's satellites he hopes to reduce the competition to his constellations.
-
Friday 16th October 2026 02:58 GMT MachDiamond
"The could start taking orders for them and may well do if some other big issue with Starship shows up in the next few launches."
There's a point where ramping back up becomes a giant expensive thing. They'd have to dig tooling out, re-allocated factory space, hire people and get them trained.
SpaceX uses up junior engineers. The hours are abusive and the pay is low.
-
-
-
Thursday 15th October 2026 17:47 GMT phuzz
The current Starship only has a tiny payload door, but presumably they can create a version with a bigger payload door. If they deign to fly anyone else's payloads of course.
They're already under contract from NASA to build a lunar lander version, which I imagine is going to take a lot more engineering than just making a door bigger.
-
Friday 16th October 2026 03:01 GMT MachDiamond
"They're already under contract from NASA to build a lunar lander version, which I imagine is going to take a lot more engineering than just making a door bigger."
The propose architecture for the lunar missions (already 2 years late) also requires an orbital depot and tanker that are yet to be designed and built. On the way to those will be proving out all of the hardware and methods to transfer and keep cold cryogenic propellants in space.
-
-
-
Friday 16th October 2026 08:28 GMT Anonymous Coward
Terje, you seem to be arguing that they're on a course for failure by not building a bigger door now (presumably thinking it'll be harder later, more likely to compromise the structure) while simultaneously stating that they should move the risk of the bigger door to their current flights.
If the perceived risk of a big door is likely to compromise the craft, that could stall other developments.
They're quite reasonably prioritising getting something capable of launching to orbit and returning for reuse. Once they've got that working (and useful, to them) they can look at making it more versatile for other customers.
Having a big door that will only ever be opened at rest or in a vacuum with neutral gravity is really not the huge engineering challenge you think. Just make sure it latches down tightly for the journey and it'll be fine.
-
-
-
-
-
Friday 16th October 2026 08:18 GMT Charlie Clark
Re: Assuming, of course, it makes it to the launchpad
That's been the story all along, not least because RocketLabs doesn't have the government contracts to help raise capital. Of course, not all launches have been a success but I think they've had far fewer fireballs than SpaceX and the technology is as least as innovative.
You have to give Musk credit for his ability to
trickconvince investors to give him their money again and again. Of course, when the interest of cheap money came to an end, he had to come up with another strategy, jumped onto to AI bandwagon, said he's stop making cars and only do AI and everyone lapped it up. Having to issue bonds so soon after an IPO could give cause for concern but, pace dotcom bubble and 2008, everyone will pretend that things like ludicrous price-to-earnings ratios weren't warning signs. But does SpaceX really have more of a business model than CoreWeave?
-
-
Friday 16th October 2026 03:03 GMT MachDiamond
Re: Assuming, of course, it makes it to the launchpad
"Nah, leaving in one piece is a bonus, as long as you get proper data from the flight(attempt) for a first go blowing up is "fine", at least as long as you don't demolish the pad to badly."
If it does blow up and it's something they just duct taped together, that would be a problem. Many rockets work on their first go, which is preferable.
-
-
Thursday 15th October 2026 17:03 GMT IGotOut
They need a new "visioneer"
"Rocket Lab's shares have taken a battering following the announcement,...."
Of course they did. They forgot to include, AI data centres on the moon by 2028, Mars colony by 2030 and the first flyby of Alpha Centuri by 2035.
Otherwise they are just a bunch of losers
-
Thursday 15th October 2026 18:03 GMT phuzz
The issue was voids that formed within the carbon composite layers during manufacturing.
That's fine! Just sand it back and apply another layer! What could possibly go wrong?
-
Thursday 15th October 2026 20:13 GMT DS999
Why are they using carbon composites?
Is the weight savings for the rocket body itself worth all the problems they are dealing with making them - and that's before all the problems they'll undoubtedly encounter trying to fly them?
Something about this reminds of the guy who thought using carbon composites for a submarine would be a great idea...
-
Friday 16th October 2026 08:34 GMT Charlie Clark
Re: Why are they using carbon composites?
I'm not sure if the weight savings are the reason: the weight of fuel tends to dominate. Carbon fibre composites have other advantages over other materials such as aluminium over time, partly because you can layer fibres in different directions to improve strength where you need it. Manufacturing has improved a lot especially since it started being used in aerospace.
They're launching around one rocket a week, which you wouldn't know from the article, which suggests they have a pretty good manufacturing process.
-
Thursday 15th October 2026 20:18 GMT Oneman2Many
Is Carbon Fibre the right choice ?
I know Rocket Lab have a lot of experience using carbon fibre for Electron but Neutron is several times bigger and the biggest single piece carbon fibre part. One has to wonder if it is right material, yes it offers weight saving but can it take repeated extreme thermal changes ?
Is there is a reason why no other rocket manufacture is using it for the whole rocket ?
-
Friday 16th October 2026 02:34 GMT Anonymous Coward
Re: Is Carbon Fibre the right choice ?
> Is there is a reason why no other rocket manufacture is using it for the whole rocket ?
Aside from "somebody has to be first" (otherwise literally every attempt at pushing engineering would be stumped by that "reasonable" question)?
> Neutron is several times bigger and the biggest single piece carbon fibre part
Get it made and Rocket Lab becomes the best at carbon fibre in the world; that is worth a lot of money. Plus the launch vehicle.
The question is really: is it worth trying just in case they manage to succeed?
Well, is anything?
-
Friday 16th October 2026 03:12 GMT MachDiamond
Re: Is Carbon Fibre the right choice ?
It's depends on the advantages it brings. ULA's method of machining blocks of aluminium, forming it into round sections and friction-stir welding the seams works, but it is very complex and takes loads of expensive machinery. It also takes lots of time. It's hard to scale without another big dose of Capex.
From what I've skimmed, the issue is the end domes. That could take more R&D time to get sorted, but once it is, they'll be able to crank out bodies at a pace. It's sounding like they have a good inspection routine that catches the voids.
-